top of page
Sipcot Industrial Park - Oragadam
Sipcot Industrial Park - Oragadam

Master Plan - SIPCOT

18 Aug 2021
Architectural Design
Plot Area

73,900 sqft

Build-UP Area

-

Structural consultant

-

Team

Ar Kishore Palani / Porous Being

Project Description

The EMI/EMC Testing Laboratory at SIPCOT Phase 2, Oragadam, is a state-of-the-art facility designed to meet the demanding needs of modern industries for comprehensive Electromagnetic Interference (EMI) and Electromagnetic Compatibility (EMC) testing. The project encompasses four specialized blocks, each equipped with cutting-edge technology to deliver a wide range of testing services essential for various sectors, including automotive, aerospace, consumer electronics, and telecommunications.

The laboratory features a double-height space, enhancing the openness and functionality of the testing environment. The building's facade is adorned with parametric fins, an innovative design choice that not only adds aesthetic appeal but also improves the internal atmosphere. These fins help regulate natural light and airflow, creating a calm and comfortable working space that enhances concentration and productivity.

Design Philosophy

The EMI/EMC Testing Laboratory aims to establish itself as a premier center for electromagnetic testing, supporting the safe and reliable operation of electronic products. The facility's design, combining functional and aesthetic elements, reflects a commitment to innovation and excellence. The serene environment fostered by the parametric fins and double-height space underscores our dedication to providing a conducive workspace for both staff and clients. This project is poised to become a vital resource in ensuring product compliance and quality, fostering technological advancement and consumer safety in the industry.

bottom of page